SOMERS SCHOOL BUILDING CONSTRUCTION COMMITTEE
May 23, 2002
Present: T.Cowles, J.Butler, D.Pinney, H.Broer,
J.Formeister, P.Roland
(7:15),
J.O'Brien (7:15)
Ex-Officio: J.MacFeat, T.Jefferson, B.Boutwell, K.Klein
Guests: D.Moser
The meeting was called to
order at 7:12 p.m. by J. Formeister.
Minutes of the May 9, 2002
meeting were approved as presented (Cowles, Broer).
Doug Moser presented some
variations to the drawings of the three schools.
There was much discussion
about costs, reimbursement, and staying within
project size and scope.
SHS---cafeteria expanded
into present faculty room, faculty room moved into
existing Health classroom,
Health into new classroom. First
floor---2 new
science labs, one classroom,
one large Health room (can be divided or extra
space used for storage),
second floor---six new classrooms. New
service
road, watching for wetlands
and property line (need updated
information/survey). Hallways and staircases will be built with
future
expansion of eight
classrooms possible.
MBA---three options were
presented, with and without portable classrooms.
After explanations and
discussion, the committee voted No unanimously to
Option A, No unanimously to
Option B, and Yes unanimously to Option C with
modifications---switch
cafeteria and band/chorus areas, build addition with
classrooms to be used for
swing space during construction (no portables
necessary), then ground
floor will be converted to central office/BOE space
and there will be a gain of
a few permanent classrooms.
SES---after discussion,
consensus of committee was to expand cafeteria and
build all new classrooms in
one area instead of two.
The contract with Moser,
Pilon, Nelson Architects will be signed by the First
Selectman at the May 28 BOS
meeting.
A meeting with building
administrators and architect to review plans is set
for May 29 and with Somers
Building Inspector, Fire Marshall, and architect
May 30.
We need water meters to
monitor flow at MBA and new survey of school property
with existing contours,
post-SHS construction.
T.Jefferson and B.Boutwell
attended some meetings with the state; the high
school construction project
audit was just completed and the PREP meeting for
the upcoming construction
will be in November.
The meeting on June 13 will
start at 7:30 due to the Strategic Plan
celebration.
Motion to adjourn at 8:52
p.m.
Respectfully submitted,
Joan
Formeister, Secretary