SOMERS SCHOOL BUILDING CONSTRUCTION COMMITTEE
March 27, 2003
Members
Present: H.Broer, T.Cowles, J.Butler,
J.MacFeat, J.Formeister
Ex-Officio: K.Klein, B.Boutwell
Others: D.Moser
The meeting
was called to order at 7:10pm by J.Formeister.
Minutes of
the 2/27/03 meeting were approved unanimously as presented (Cowles, Butler).
SHS---plans
presented by D.Moser and reviewed. He
will look to add room for tractor trailer trucks to turn around behind
SHS. No extension of covered
walkway. Access to HVAC second floor
shown. Plumbing, structural,
electrical, mechanical all shown in varying degrees of completion.
SES---relocation
of oil, gas tanks, waiting for survey results. Lighting in new parking
area. New paved play area
discussed—good location? Need staff
input. New septic tank and siphon
chamber located, demolish old. Will
check slope of driveway connecting SES and SHS parking areas. Renovation of old shower area may not be
completed, remain as storage. Peak of
roof at end of addition, for aesthetics, need a price estimate. D.Moser stated budget is okay, as discussed
at last meeting regarding changes at SES.
Schedule---survey
is due 4/15/03. Schedule presented from
Rocco Roberts for obtaining local approvals.
Code plan has been started.
D.Moser stated we should plan on meetings the 4th Thursday of
each month. April 1 there will be
meetings with SES and SHS staff to review plans. Times will follow.
Old
business---MBA plan reviewed. 50 new
parking spots inside new bus loop for staff.
Discussion of entrance/exit of existing parking lot and what would be
safest. Water service now in back of
building; may enter near gym in new plan.
Need to dig 8 holes around perimeter of septic system, probably during
April vacation. J.MacFeat will speak to
town crew about doing this with their backhoe.
B.Boutwell
stated the town treasurer had expressed need to possibly push out MBA
project. 3-4% escalation would need to
be added to each year. Also we are
bound by the state as to timeline and when we must break ground. D.Moser will verify the date.
EDO49R’s
have just been sent to the state. They show MBA costs as ineligible that are in
fact reimbursable; that is how the state tracks them.
Bills were
unanimously approved as follows (MacFeat, Broer)---to MPN, SES $16,637.62, 100%
schematic design; to MPN, SHS $26,801.71, 100% schematic design, 40% design
development.
Motion to
adjourn at 8:50pm.
Respectfully
submitted,
Joan Fromeister,
Secretary